0 Item(s)

SMC ETP SYSTEM

Predictive Maintenance System for Power Transformers

ETP SYSTEM is a complete predictive maintenance instrument to detect the problems before unexpected failures appear in power transformers, autotransformers, and instrument transformers, reducing non-programmed shutdowns, transport, and catastrophic costs.

Order #: ETP-SYSTEM

Mfg Part #: ETP SYSTEM

$90,167.00 USD
 
 

Usually ships in 7-10 days

Free shipping over $250

This product is available for shipping to United States only

Add Items to Cart

Request a Calibration Quote

Transcat can calibrate your existing instruments.

Request a Calibration Quote

Rent From Transcat

Do you need a test instrument for a short time?

Request a Rental Quote

click on image to view gallery image(s)

View All SMC Products

Compare Products in this Series See all Results

Product
Image
NAME, DESCRIPTION
AND ORDER #
Stock
Status
UNIT PRICE QTY
SMC ETP-4 SMC ETP-4

Transformer Short Circuit Impedance Measurement Unit

Order #: ETP-IV

Usually ships in 7-10 days

$20,200.00 USD
Add Items to Cart Add to Quote

SMC ETP-1 SMC ETP-1

Transformer Turns Ratio Measurement Unit

Order #: ETP-I

Usually ships in 7-10 days

$21,050.00 USD
Add Items to Cart Add to Quote

SMC ETP-3 SMC ETP-3

Transformer Winding Resistance Measurement Unit

Order #: ETP-III

Usually ships in 7-10 days

$26,000.00 USD
Add Items to Cart Add to Quote

SMC ETP-2 SMC ETP-2

Recovery Voltage and Insulation Evaluation Unit

Order #: ETP-II

Usually ships in 7-10 days

$35,100.00 USD
Add Items to Cart Add to Quote

SMC EDA-III SYSTEM SMC EDA-III SYSTEM

Insulation Evaluation System for Motors and Generators

Order #: EDA-III-SYSTEM

Usually ships in 7-10 days

$46,950.00 USD
Add Items to Cart Add to Quote

Overview :

Product Highlights

The main objective of the ETP system, is to optimise the maintenance costs, enabling an early detection of possible failures, improving management of the transformer data status, and reduces the time the transformer is out of service. This system measures with a capacity to detect and confirm all possible problems in each of the following of the transformer parts:

  • Core.
  • Windings integrity.
  • Liquid and solid insulation system.
  • Internal windings position.
  • Regulator.

The ETP system makes the following measurements:

  • Automatic three-phase turns ratio and an open circuit test.
  • Recovery voltage test/Insulation Resistant test/Polarization Index.
  • Automatic three-phase winding resistance test with temperature correction.
  • Short circuit impedance / Short circuit current.

Besides the user-friendly software, automatic measurements, the test results, are numeric values and/or in graphic form are automatically stored, and test information can be printed. In order to check and test incipient transformer problems, it’s important to make all the tests in a relatively short time, and reduce external errors by measuring instruments and the operator.

Accessories :